Power Interruptions

Be informed with the latest power interruptions of NGCP and BOHECO I

Mon, Aug 13, 2018

Please be informed that there will be a scheduled power interruption on Monday, August 13, 2018, from 11:00 AM to 5:00 PM. This is to facilitate pole replacement and line relocation.

Affected areas:

Brgy. Abucay Sur, portion of Abucay Norte of Sikatuna

Brgy. Cantiquib, Dangay of Alburquerque

Thu, Aug 9, 2018

Please be informed that there will be a scheduled power interruption on Thursday, August 9, 2018, from 6:00 AM to 5:00 PM. NGCP personel will facilitate corrective maintenance on Loboc-Tagbilaran 13.8kV line. We will also be replacing the rotten wooden crossarms from Bool, Tagbilaran to Guiwanon, Baclayon backbone line.

Affected areas:

Feeder 5 – Dampas Substation (6:00 AM – 5:00PM)

Feeder 10 – Loay Substation (6:00 AM – 6:30 AM | 4:00 PM-4:30 PM)

Brgy. Sta. Cruz, Guiwanon, San Isidro, Baclayon (6:00 AM – 5:00 PM)

Tue, Aug 7, 2018

Please be informed that there will be a scheduled power interruption on August 7, 2018 at Feeder 17, Maribojoc Substation. This is to facilitate pull-out of poles and transfer of 13.2KV lines at Brgy. Dipatlong, Maribojoc.

Schedule of interruption as follows:

8:30 AM – 4:30 PM – Feeder 17 (Dipatlong to Punta Cruz of Maribojoc)

8:30 AM – 8:45 AM | 4:15 PM – 4:30 PM – (Brgy. Pig-ot, Cabadug, Tangnan, Cuasi, Taytay, Tontunan, Song-on of Loon)

Mon, Aug 6, 2018

Please be informed that there will be a scheduled power interruption on August 6, 2018 from 8:30 AM to 4:30 PM. This is to facilitate replacement of poles, upgrading of lines proposed Fernando/Luz Salmasan Ricemill.

Affected Line Section:

Pole # 31-27, Single phase line Riverside, Bicao, Camen

Aug 1, 3 & 5, 2018

Please be informed that there will be a scheduled power interruption on August 1, 3, & 5, 2018 from 8:30 AM to 4:30 PM. This is to facilitate replacement of poles, construction of three phase primary line proposed RITCHLI Water Treatment Plant at Sitio Malingin, Patrocinio, Cortes.

Affected Line Section:

Single phase line Brgy. Patrocinio, Cortes

Sat, Aug 4, 2018

Please be informed that Maribojoc 5MVA Substation connected along Corella-Maribojoc 69kV T/L will be de-energized on August 4, 2018 at 8:00 AM to 12:00 NN to facilitate the replacement of Main and Feeder 17, 15kV Disconnecting/Isolating Switches. Power will be cut only at the 69kV Air Break Switch in said substation.