Power Interruptions

Be informed with the latest power interruptions of NGCP and BOHECO I

Mon, Aug 6, 2018

Please be informed that there will be a scheduled power interruption on August 6, 2018 from 8:30 AM to 4:30 PM. This is to facilitate replacement of poles, upgrading of lines proposed Fernando/Luz Salmasan Ricemill.

Affected Line Section:

Pole # 31-27, Single phase line Riverside, Bicao, Camen

Aug 1, 3 & 5, 2018

Please be informed that there will be a scheduled power interruption on August 1, 3, & 5, 2018 from 8:30 AM to 4:30 PM. This is to facilitate replacement of poles, construction of three phase primary line proposed RITCHLI Water Treatment Plant at Sitio Malingin, Patrocinio, Cortes.

Affected Line Section:

Single phase line Brgy. Patrocinio, Cortes

Sat, Aug 4, 2018

Please be informed that Maribojoc 5MVA Substation connected along Corella-Maribojoc 69kV T/L will be de-energized on August 4, 2018 at 8:00 AM to 12:00 NN to facilitate the replacement of Main and Feeder 17, 15kV Disconnecting/Isolating Switches. Power will be cut only at the 69kV Air Break Switch in said substation.

Fri, Aug 3, 2018

Please be informed that there will be a scheduled power interruption at our 5MVA Carmen Substation on Friday, August 3, 2018, from 12:00 NN to 2:00 PM. This is to facilitate Servicing & Testing of 69KV Power Circuit Breaker.

Affected Areas:

Municipality of Sagbayan, Carmen, Batuan, Bilar, and parts of Dimiao (Brgy. Cadap-agan, Canhayupon, Villasuerte, Lapsaon, Canlambong, Cabanbanan)

Thur, Aug 2, 2018

Please be informed that there will be a scheduled power interruption on Thursday, August 2, 2018 from 1:00 PM to 4:30 PM. This is to facilitate load splitting, installation of additional distribution transformers.

Affected transformer section(s):

Pole # 12/13 = 75KVA, Totolan Dauis.

July 29, 31 & Aug 2, 2018

Please be informed that there will be a scheduled power interruption on July 29, 31 and August 2, 2018 from 8:30 AM to 4:30 PM. This is to facilitate replacement of poles, upgrading of lines proposed Balilihan to Corella tie line.

Affected Line Sections:

Single Phase line Brgy. Maslog, Magsija, Cantalid of Balilihan.