Power Interruptions

Be informed with the latest power interruptions of NGCP and BOHECO I

Thu, Oct. 8, 2020

Please be informed that there will be a power interruption on Thursday, October 8, 2020 from 10:00AM to 12:00NN. This is to facilitate erection of pole additional structure due to low vertical clearance.

AFFECTED LOCATION: From pole ID.3/33-1, Three-phase line going to Lower Catarman Dauis

Oct. 3 & 7, 2020

Please be informed that there will be a power service interruption on October 3 & 7, 2020 from 9:00AM to 4:00PM to facilitate line construction at Ticugan – Tubodacu, Loon.

Affected Areas: Portion Basac, Brgy. Ticugan and Tubodacu, Loon

Sep 21,25,28, 2020

Please be informed that there will be a power interruption on September 21, 25 and 28, 2020 from 8:30AM to 4:00PM. This is to facilitate replacement of poles and upgrading-conversion of primary line from 1-Phase to 3-Phase proposed LGU-Loon Waterworks located at Barangay Ticugan, Loon.

Affected Line Locations: Single phase line along road Barangay Basac, Ticugan, Tubodacu of Loon.

Fri, Sep 18, 2020

Please be informed that there will be a power interruption on Friday, September 18, 2020 from 10:00AM to 3:00PM. This is to facilitate replacement of rotten wood poles near Caberte Rice Mill, Poblacion, Sevilla.

Affected Areas: Barangay Cabancalan, Lico-lico, Calinga-an, Bayawahan, Magsaysay and portion of Poblacion of Sevilla.

Sat, Sep. 12, 2020

Please be informed that there will be a power interruption of NGCP (National Grid Corporation of the Philippines) on Saturday, September 12, 2020 affecting Loay and Panglao Substations. This is to facilitate the replacement of poles and crossarm at selected structures along Tagbilaran – Garcia 69KV line.

Affected Areas: Brgy. Montana, Baclayon, Albur, Loay, Loboc, Sevilla, Lila and Dimiao (6:00AM-6:00PM); Brgy. Sta. Cruz to San Roque, Baclayon (6:00AM-7:00AM & 5:00PM-6:00PM); Mun of Dauis & Panglao (6:00AM-7:30AM & 5:00PM-6:00PM)

Thu, Sep. 10, 2020

Please be informed that there will be a power interruption on Thursday, September 10, 2020 affecting Carmen Substation from 12:01 NN – 1:00 PM. This is to facilitate the Tapping of 13.2KV Main-Disconnect Switch.

Affected Areas: Feeder7 – Villarcayo, Carmen – Mun. of Sagbayan – San Jose, Inabanga – Maitum, Catigbian; Feeder13 – Mun. of Carmen & Batuan; Feeder 8 – Mun. of Bilar – Canlambong, Dimiao.